Page Four
Of Our Airplane Building----"The Landing Gear and Wings"
|
Our Tail Wheel design. |
|
|
Left Main Landing Gear looking aft. |
|
|
Another shot of the tail wheel. |
|
|
Left wing half. Both wing panels built in about 2 1/2 days. |
|
|
Left Aileron shown along with the external sleeves on the aft spar. |
|
|
A view of the rudder cable guide pulley. Also the aileron and elevator bell-cranks. |
|
|
Wing tip bow with brace being riveted in place. The bow will be stiffened up by foam semi spars from the outer rib to the tip bow. As of the end of day Monday, May 1st. we had about half the wing ribs hot wired to shape. |
|